Monday, August 2, 2010

The Value For My Money Question

Time and again Steve and I run up against the same consumer attitude: What value can I get for my money? We would like to address that question in a roundabout way with another question: What is your budgetary upper limit for any given expense? For example, how much are you willing to spend for a relaxing, beautiful vacation in Hawaii? What's your top price for a car? These are very personal evaluations and we are well aware that there is great variation from individual to individual or from family to family.

Now we come to the question that is so very pertinent and close to our hearts: What is your upper limit for that remodel you've been dying to get started but keep delaying because of the economy? Rarely do people want to confide that upper limit to us, and we can only guess that this is due to lack of trust and fear of being exploited.

The fact is, we want to give you the best value for your budget. However, nine times out of ten we don't know that budget, and it remains a mystery as we struggle to arrive at a reasonable estimate to build the new kitchen of your dreams or that fabulous new bathroom.

We are not a "pricey" company, something we've heard others mumble about as they pick their way through numerous contractors and bids. We are reasonably priced and stand by our estimates. They are extremely accurate through years and years (25 to be exact) of estimate experience and up-to-date knowledge of the materials and subcontractors.

Will you get the same job for a lower price? Doubtless, no. A remodeling project is complex and detailed. We make sure the details are perfect and the complexity is our headache, not yours.

Monday, June 8, 2009

Warrine Shares More of Her Story


Here is the third installment of Warrine Coffey's remodeling journal. As a guest blogger, she has much to offer from the homeowner's point of view and experience going through a large renovation.

APPLIANCES AND WORKERS

"Another six weeks have passed since my last epistle on our project. We are now 75% through and it's looking good. We've had our ups and downs.

We ordered the appliances and had them all delivered except for the cooktop which we picked up ourselves so our contractor could get the exact measurements. The dishwasher and ovens went directly into the kitchen to await a later installation. The new refrigerator is in the dining room so we are very crowded with two refrigerators and everything else we need in there for our temporary kitchen. It's just for a few weeks, so we just live with it.

One day we had 2-3 of our contractor's men here in the kitchen AND the burglar alarm folks (2 people) working throughout the house AND several exterior painters. Talk about chaos! The new alarm failed that same evening. The next day the alarm guy was back and the appliances were delivered and work continued in the kitchen.

A few weeks ago they removed the plywood barriers between the kitchen and the rest of the house. Now when we want to see the kitchen we don't have to go out the front door and around to the back. We just walk through the interior door.

A 'HOT' DISAGREEMENT ON OVENS

We had a major argument - I mean difference of opinion - on ovens. Bill felt stronger about it so he got his way. The contractor was agreeable to the changes and now all is well. I thought the hardest part of this remodel was the hundreds of decisions that have to be made, often without adequate knowledge about what is being decided. I was wrong. That is the second hardest part. The hardest part of a major project is the other person...Now I know why people ask if we're still married after several months of construction. I tell them we are, indeed.

OUTDOOR AND INDOOR LIVING

Our little temporary balcony off the dining room continues to be a blessing through all this. It has its problems, though. There were the ants that appeared the first week, so we learned to be very careful about leaving any dirty dishes out there. Now there is a tree in the front yard with pollen that attracts bees, so the bees have found our balcony...I learned that ants like dog food and bees like tuna.

As of last week we have lights on in the kitchen and the doorbell works after four months of doing without. Most of the cabinets are in. The crown molding around the ceiling is lovely. The stone countertops are in. The bathroom floor tile and backsplash are in. Today most of the plumbing fixtures were installed and we have water in the new kitchen - with hot water! We no longer have to haul hot water from upstairs. That means we can wash dishes inside like other folks.

PERSONAL GROWTH

An unexpected side effect of doing this major construction project is the personal growth that occurs during it. Choosing to do something truly difficult and actually doing it without too much bellyaching is a real accomplishment. It's so much easier to let things be the way they were. I'm so glad we didn't. We are stronger for the effort we have put in, plus we're going to get a lovely new kitchen when it's all over.

Friday, May 22, 2009

Onward Remodeling Soldiers!


My Blogger Guest, Warrine Coffey, continues with her saga of home remodeling. She is talking at first here about her dog, who was a canine warrior and a noble beast:

DOG ON THE PREMISES

"Nigel was very agitated when we brought him home after vacation. He doesn't like being boarded and when he got home, his bed and food dish had moved and the house was in disarray and noisy. We gave the necessary TLC to calm him down. He quickly adjusted and is just fine. We take him into the back area with us so he can see what's happening. He likes the additional attention from the workers.

SUBS MOVE IN

After about three weeks of this, I realized we could cook, eat well, have clean clothes, and find things. So I began to relax somewhat. So it was back to planning and making decisions for the project. The foundation for the extension was poured May 19. Framing is pretty much done. The rough plumbing is in. The electrician starts Monday. One interesting aside is this: When the plumber started, one of the first things he did was to install a water shut-off valve in the basement for the area in back of the house. That involves the kitchen, laundry, powder room and master bath. When he worked he would shut off those areas. That left us the upstairs hall bathroom and the sink on the balcony. We had a toilet and hot and cold running water almost all the time. Life is easier than it would be without that valve.

DOWN THE CONSTRUCTION ROAD

I think our contractor has been wonderful. He plans things out carefully, keeps us informed and keeps things moving. When one works on an 80-year-old house, there are going to be some glitches. He is very experienced and will help us get through the glitches. I am still amazed at the temporary kitchen setup. I had envisioned washing dishes in the bathtub, scrubbing vegetables in the bathroom sink, etc. Those are the stories I have heard from other people. I think we are very fortunate to have the setup we have. Most people who see it are amazed. We haven't even gone out together for dinner because we always have prepared food here. I do not focus on what we don't have. I just focus on what we do have which is plenty more than millions of people in the world today have. And I never forget the prize: a new kitchen down the road.